The concrete bridge beam installation at Bridge B4 marks a major milestone in the Strategic Infrastructure Works for Meridian Water, one of Enfield’s flagship regeneration projects. Shay Murtagh supplied and delivered eight precast concrete bridge beams, each measuring 22 metres in length and weighing around 35 tonnes, manufactured at our production facility in Raharney, Co. […]
At Shay Murtagh Precast, our bridge engineering expertise was central to the delivery of the Greek Street bridge, part of a £20m upgrade benefiting both the road and rail network south of Stockport station. This innovative structure carries a roundabout over the West Coast Main Line, improving traffic flow while supporting critical railway operations. All […]
Shay Murtagh was proud to play a vital role in the transformation of Stockton Waterfront through the bridge beam installation of 47 high-specification concrete beams for a prominent new land bridge at the heart of the development. Commissioned by Esh Group for Stockton-on-Tees Borough Council, this key infrastructure element provides a level pedestrian route between […]
Cambridge South Station represents a transformative infrastructure development supporting the expansion of the biomedical campus in southern Cambridge. As a trusted precast concrete partner, Shay Murtagh was selected to deliver vital elements for this high-profile rail project. Designed to alleviate congestion and improve access to key employment and research hubs, the station required high-quality, precision-engineered […]
The M25 Junction 10/A3 Wisley Interchange improvement scheme is a critical infrastructure upgrade designed to enhance traffic flow and improve safety at one of the UK’s busiest and most accident-prone motorway junctions. Led by Balfour Beatty, with design and engineering support from AtkinsRéalis, this major project involves widening the motorway, adding lanes to the A3, […]
The HS2 Interchange Station in Solihull is a key project for UK high-speed rail, and at Shay Murtagh, we were proud to deliver one of its most critical components: 15 colossal pre-cast concrete bridge beams. Each beam, weighing up to 565 tonnes and stretching 46 metres in length, was produced at our cutting-edge facility. These […]
This development is part of Policy A31 of the 2019 Guildford Borough Local Plan, which allocates land for new housing in Ash and Tongham. The new bridge will also reduce congestion in the area and The scheme has therefore been able to benefit from a substantial Housing Infrastructure Fund grant secured from the government. Currently, […]
Shay Murtagh is proud to be a part of the Heads of the Valley Expansion Project, a £500 million project located in Aberdare, Rhondda Cynon Taf, Wales. The project is being executed by FCC, a Welch-Spanish Consortium, and funded by Meridiam. This project is crucial for the improvement of mobility and connectivity in Wales and […]
An impressive bridge reconstruction job in a stunning location at Commondale in the North York Moors, working with Network Rail. The project included the removal of old riveted steel plate deck and timber waybeams, replaced with new Precast concrete cills, beams and bridge parapet units cast by Shay Murtagh Precast Ltd. These were stitched together […]
Stourbridge, a market town in the UK West Midlands, has one unusual claim to fame: at 1.3 kilometres, the Stourbridge Town Branch Line is claimed (though the claim is hotly disputed) to be the shortest standard-gauge railway line in the world. It was originally constructed in 1879 to take freight between the main line and […]