A lazy image

Baffinland Iron Mines Corporation

Baffinland Iron Mines Corporation (Baffinland)’s Mary River mine site on Baffin Island, Nunavut, Canada is one of the most northern mines in the world. Amongst the richest iron ore deposits ever discovered, the Mary River Property consists of nine-plus high-grade iron ore deposits that can be mined, crushed, and screened into marketable products. Baffinland Iron […]

A lazy image

Data Centre Project Dublin

Take a look at a recent data centre project where we completed design, manufacture and delivery of liftshafts and staircores. Completed were : For more information please contact: sales@shaymurtagh.co.uk See More Case Studies Here

A lazy image

Boho X Project Middlesbrough

Middlesbrough is a hotbed of digital tech innovation, home to digital leaders across various sub-sectors. The Boho Zone is Middlesbrough’s digital and creative quarter, and the beating heart of the Tees Valley’s digital tech offer. Since the formation of the zone in 2009, with the opening of flagship building, Boho One, The Boho Zone has […]

A lazy image

Old Street London

The design, supply and installation of the new TFL underground entrances to the Main Entrance and Cowper Street Entrances to the Old Street underground station by Shay Murtagh. The Main entrance consists of 98 tonnes of precast concrete, self-supported and cantilevered of a 20 tonne precast column. Each “arm” of the structure was unique in […]

A lazy image

Battersea Power Station Phase 3B

Our sister company Evans Concrete Products Ltd were awarded the Battersea Power Station Phase 3B architectural precast concrete planters project by Maylim. The bespoke concrete planter is located in the Electric Boulevard area and are the continuation of our earlier work on Phase 3A for Careys. We collaborated with Maylim and LDA Design to create […]

A lazy image

Precast Beams For London City Airport

Significantly smaller than the giant Heathrow Airport, London City Airport is nevertheless an important transport hub, particularly for the financial sector of the City of London.  The airport needs to expand in order to cater for an estimated two million per annum growth in passengers. The £480 million project involves technological advances that only a […]

A lazy image

Corrib Gas Tunnel Project – Video

Each and every project we complete at Shay Murtagh Precast brings us satisfaction and drives us to improve, create and build our team for the next challenge. One of these challenges was Shell – Corrib Gas Tunnel project. The tunnel was one of the largest contracts completed in Ireland over the last number of years […]