A lazy image

London Super Sewer Project – Work In Progress

Proud to see some of the work in progress by our team at Evans Concrete Products Ltd featured with Tideway London recently as part of their London Super Sewer project. London’s super sewer project, officially known as the Thames Tideway Tunnel, is a major infrastructure initiative aimed at addressing the issue of sewage overflow into […]

A lazy image

Battersea Power Station Phase 3B

Our sister company Evans Concrete Products Ltd were awarded the Battersea Power Station Phase 3B architectural precast concrete planters project by Maylim. The bespoke concrete planter is located in the Electric Boulevard area and are the continuation of our earlier work on Phase 3A for Careys. We collaborated with Maylim and LDA Design to create […]

A lazy image

Final Settlement Tank Structure For Earby WwTW

Yorkshire Water is investing seventeen million pounds in improving its waste water treatment systems across the county.  In particular, it is concentrating on the removal of phosphorus from waste water. A chemical that is environmentally damaging, and can have a serious impact upon aquatic life. Four of its treatment works have been singled out for […]

A lazy image

Attenuation Tanks For Royal Wharf, London

Ballymore wanted nothing but the best for this development, which is why it turned to the leading manufacturer of precast concrete tanks to design, manufacture and install two underground storm water attenuation tanks.  Shay Murtagh Precast Concrete, with over forty years’ experience, were the first choice, and Ballymore’s measures to mitigate the inevitable effects of […]

A lazy image

Final Settlement Tanks for Chorley Wastewater Treatment Works

About Wastewater Treatment Works Final Settlement Tanks Shay Murtagh recently contracted to design, manufacture, deliver and install three Final Settlement Tanks by C2V+, aCH2M and VolkerStevin joint venture. As part of upgrading the Wastewater Treatment Works in Chorley. Our technical design team completed drawings and 3D renderings for each of the tanks for C2V+ approval.

A lazy image

Whitechurch Waste Water Treatment Plant

Design, manufacture, supply and erect 7 no prestressed and post-tensioned concrete storage tanks for the wastewater treatment plant and reservoir in Whitechurch – By Shay Murtagh Precast.   Internal Diameter Wall Height Aeration Tank No. 1 10.40m 5.0m Aeration Tank No. 2 7.97m 5.0m Settlement Tank No. 1 8.95m 3.0m Settlement Tank No 2 6.99m […]

A lazy image

Mullingar Sewerage Improvement Scheme – BAM LTD

The Mullingar Sewerage Improvement Scheme is currently underway which has a total expenditure of €36 million (approx). The works are broken up into two contracts, the first contract awarded to Veolia Water Ireland for the design and build element of the DBO contract and is valued at €24,9m. The construction period is two years, with […]

Form

Name

Email

Phone