We recently completed works in Dewsbury for our Client Barhale at Dewsbury WwTW for Yorkshire water.
The project involved the construction of 3no. 46m Diameter sloped bases with central hoppers.
Total 362Ton of Rebar fixed on site.
Total of Just Under 4000m3 of concrete for blinding and structural base pours.
3no. Pre-Stressed – Post Tensioned Primary Settlement Tanks
2no. Tanks 44.9m Diameter x 3.31m High and 1no. 44.9m x 4.3m high.
Each tank comprised of 59no. wall panels with built in concrete launder channel along with top band copings and adjacent chambers.
A total of 275no. pieces of precast on 55no. lorry loads transported to site and installed