The Mullingar Sewerage Improvement Scheme is currently underway which has a total expenditure of €36 million (approx). The works are broken up into two contracts, the first contract awarded to Veolia Water Ireland for the design and build element of the DBO contract and is valued at €24,9m.
The construction period is two years, with a completion date 3rd quarter 2010. Veolia awarded the civils contract to BAM Ltd to which Shay Murtagh Precast. tendered and were awarded the large number of concrete septic tanks required. Singularly this is one of the largest contracts we have completed. We supplied all the readymix concrete required for these large bases from our factory and on two of the large pours we brought in a number of outside local hauliers.
With one singular pour being 1200m³ all three mixing plants were required and our transport and maintenance teams facilitated a smooth delivery of concrete on the day.
Listing below of all concrete septic tanks manufactured delivered and erected by Shay Murtagh Precast
Internal Diameter | Wall Height | |
Settlement Tank – 2 no | 21.53m | 3.00m complete with sloping floor and central sludge collection hopper |
Anoxic Tank | 35.72m | 6.54m complete with flat base & Open top |
Aeration Tank
|
36.48m | 6.54m complete with flat base & Open top |
Imported Sludge Holding Tank | 9.92m | 4.41m complete with flat base & Concrete roof structure |
Thickened Sludge Holding Tank | 11.37m | 5.20m complete with flat base & Concrete Roof |
Stormwater Holding Tank | 14.28m | 5.00m complete with Flat Base with 1% fall to floor sump |
Clearwater Holding Tank | 11.86m | 5.50m complete with flat base & Concrete roof structure |
Wash Water Tank | 10.40m | 6.00m complete with flat base 1% Slope to floor sump |