The Macclesfield Wastewater Treatment Works (WwTW) project represents a landmark collaboration between Shay Murtagh and our partners, delivering a state-of-the-art storm inlet works solution using precast concrete panels. With over 220 precast panels and two precast raker beams, each weighing over 50 tonnes, this project showcases the value of off-site precast construction in addressing space […]
Category: Commercial Projects
Mallow Reservoir
Shay Murtagh was engaged by our client Coffey Construction to design, manufacture and install a water reservoir to service the Mallow area. The internal diameter of the tank is 33.420m with a panel height of 3.635m. Once all panels were been placed high tension strands were pushed through conduits which are cast into the units […]
Macroom Waste Water Treatment Works
Shay Murtagh was engaged by our client Glanua Ltd to design and install a PFT, a Grit Trap and a Formula ‘A’ Chamber. All three structures also had bespoke stairs and landing arrangements. In order for facilitate other works on site it was agreed that Shay Murtagh would complete our installations on a phased basis. […]
Castlemartyr Aeration Tank
As part of the Castlemartyr Waste Water Treatment Works Upgrade for EPS, Shay Murtagh Ltd were tasked with the design, manufacture and installation of an Aeration Tank. Base dimension of the tank is 21.4m by 14.1m with a panel height of 6.5m. Some of the panels weight in excess of 18t. A total of 53no. […]
Windmill Hill Reservoir Project
Shay Murtagh was engaged by Shareridge Ltd. to design, manufacture and install a water reservoir in Rathoath, Co. Meath. To achieve the required head of pressure a lower tank was first constructed and back filled. This provided a solid base for which to construct the upper tank. The lower tank measured 37.250m in diameter with […]